← Tooling compatibility finder

99-1336

99-1336 nose assembly · Nose / pulling head · Huck · Offset

99-1336 installs HuckMAX™ blind rivet -4, -5, -6 on a 2013.

Catalog noteDetails
Figure 2; 0 flats (Nose Assembly Specifications).
Everything it installs2 fastener groups

HuckMAX™ blind rivet -4, -5, -6, per the Huck catalog

HUCK-CLINCH® blind rivet -4, -5, -6, per the Huck catalog

Other brands' equivalents1 statement
Sources3
  1. Huck Aerospace Installation Equipment catalog (Jan 2010, archived), p.80, Model 2013, Standard Inline & Offset Nose Assemblies ↗
    • Model 2013, Standard Inline & Offset Nose Assemblies (1/8", 5/32" and 3/16" columns).
  2. Huck Aerospace Installation Equipment catalog (Jan 2010, archived), p.82, Model 2013, Standard Inline & Offset Nose Assemblies ↗
    • Model 2013, Standard Inline & Offset Nose Assemblies (1/8", 5/32" and 3/16" columns).
  3. Gage Bilt Aerospace Catalog 2017 (archived; pages are PDF pages), p.142, Other - Gage Bilt Cross Reference, page 37 ↗

Tool catalogs are the manufacturers' as published in the cited edition; confirm current PNs with the tool maker before purchase. Install per the OEM process specification.

Published dimensions3 · for envelope CAD
FeatureValueAs printedSource
Length from tool face(A, Figure 2 (p.80))3.38 in3.38

Same values in the 1/8", 5/32" and 3/16" tables.

Huck Aerospace Installation Equipment catalog (Jan 2010, archived), p.80, Nose Assembly Specifications ↗
Centerline to edge(B, Figure 2 (p.80))0.25 in0.25

Same values in the 1/8", 5/32" and 3/16" tables.

Huck Aerospace Installation Equipment catalog (Jan 2010, archived), p.80, Nose Assembly Specifications ↗
Offset head height(C, Figure 2 (p.80))1.56 in1.56

Same values in the 1/8", 5/32" and 3/16" tables.

Huck Aerospace Installation Equipment catalog (Jan 2010, archived), p.80, Nose Assembly Specifications ↗

Only dimensions a document prints are listed, with the feature each one measures. None of these catalogs publishes nose tip or anvil geometry detailed enough to machine from.

Next · 3 Quote

Put the tool on the quote

Add to quote puts this PN on the one quote with its citation. Tooling needs no lot traceability.