◈SpecLok
  • Part number
  • Find a tool
  • Get quotes
  • Learn
More ▾

Learn

  • How specialty fasteners work
  • Explore fasteners
  • Catalog
  • AN / MS / NAS hardware
  • 3D model library
  • Compare side by side
  • Installation tooling guide
  • Design calculators
  • All articles

Select

  • Joint selector
  • Part-number decoder
  • Part-number cross reference
  • Which tool installs this part
  • Part-number index
  • Grip length planner
  • Hole schedule & grip review
  • BOM decoder

Quote and procure

  • Your quote
  • Request a tool: buy, rent or repair
  • Installation tooling
  • Preview the RFQ document
  • Your quote requests
  • Inventory and certs
  • The sourcing reality

Learn

  • How specialty fasteners work
  • Explore fasteners
  • Catalog
  • AN / MS / NAS hardware
  • 3D model library
  • Compare side by side
  • Installation tooling guide
  • Design calculators
  • All articles

Select

  • Joint selector
  • Part-number decoder
  • Part-number cross reference
  • Which tool installs this part
  • Part-number index
  • Grip length planner
  • Hole schedule & grip review
  • BOM decoder

Quote and procure

  • Your quote
  • Request a tool: buy, rent or repair
  • Installation tooling
  • Preview the RFQ document
  • Your quote requests
  • Inventory and certs
  • The sourcing reality

Aerospace Fasteners

SpecLok · a fastener-selection aid, not a certified design authority. Always verify against the controlling spec, OEM process, and your stress group.

Collects anonymous usage data to improve selection and sourcing. No personal info unless you add an email to a quote request.

Your account

← CherryLOCK

Shop verification card

CherryLOCK

Cherry · Blind rivet · CR2xxx · e.g. CR2249-5-04 (= NAS1738B)

speclok.com
11/16/2026

Install sequence

  1. 1. Inserted, sheet gap

  2. 2. Bulb starts

  3. 3. Clamp-up

  4. 4. Shear ring shears

  5. 5. Stem stops flush

  6. 6. Locked, stem breaks flush

Traced from Cherry CA-1005 (CherryLOCK), p.3, Installation Sequence. Not to scale.

Before you install

  • Diameters offered: 1/8, 5/32, 3/16, 1/4"
  • Tool: Cherry hydroshift riveters with pulling heads (CA-1005 tooling section)
  • Proprietary system required.
  • Training: Not stated in the cited documents.
  • Lead-time risk: Low

Installed preload

Not published. CA-1005 and CA-1013 say only "high stem break load provides high preload"; no number anywhere.

Gauge kit (published part numbers)

GaugeSizesChecks / limitsSource
269C3allGrip gage for CherryMAX & CherryLOCK rivetsCherry CA-1013 (CherryLOCK process manual), p.12, Gages
T172-3-3T172 GO/NO-GO hole gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages
T172-4 / T172-400 (bulbed)-4T172 GO/NO-GO hole gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages
T172-5 / T172-500 (bulbed)-5T172 GO/NO-GO hole gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages
T172-6 / T172-600 (bulbed)-6T172 GO/NO-GO hole gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages
T172-8-8T172 GO/NO-GO hole gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages
P913-3Anvil gage (go no-go)Cherry CA-1013 (CherryLOCK process manual), p.12, Gages
P856-4Anvil gage (go no-go)Cherry CA-1013 (CherryLOCK process manual), p.12, Gages
P857-5Anvil gage (go no-go)Cherry CA-1013 (CherryLOCK process manual), p.12, Gages
P858-6Anvil gage (go no-go)Cherry CA-1013 (CherryLOCK process manual), p.12, Gages
P859-8Anvil gage (go no-go)Cherry CA-1013 (CherryLOCK process manual), p.12, Gages
680A159allSetting gageCherry CA-1013 (CherryLOCK process manual), p.12, Gages

Removal

Published: Cherry CA-1013 (CherryLOCK process manual), Rivet Removal. CAUTION: Never drill completely through the rivet sleeve to remove a rivet as this will tend to enlarge the hole. Steps: speclok.com/tooling/cherrylock#removal

Accept / reject after install

  • Installed flushness inspected to the break-off limits of NAS1400 / NAS1740.
  • Stem and collar protrusion, per diameter (stem-above-collar / collar-above-head max): -3: .015"/.010"; -4: .015"/.010"; -5: .020"/.010"; -6: .025"/.015"; -8: .030"/.020". Slight collar flash acceptable.
  • Self-inspecting: if stem and collar are within flushness limits, blind-head inspection is unnecessary (CA-1013).
  • Grip length marked on the rivet head serves as visible-side grip verification (most diameters).

Check gauges

  • 269C3 grip selector gage.
  • T172 GO/NO-GO hole gages (T172-3 through -8; -400/-500/-600 for bulbed).
  • P913/P856/P857/P858/P859 anvil GO/NO-GO gages for lock-ring anvil wear (tool maintenance).

Sources: CA-1005 catalog · CA-1013 process manual. Acceptance limits belong to the controlling spec: verify against your program's process documentation before use on hardware.

Sources

2
  1. Cherry CA-1005 (CherryLOCK catalog)
  2. CA-1013 process manual

Reference only: the controlling drawing, its process spec and the manufacturer's installation instructions govern. How to use these answers