Shop verification card
Cherry SST
Cherry · Blind rivet · CR6xxx · e.g. CR6253-6-05
speclok.com
11/16/2026
Install sequence
1. Inserted
2. Pulling
3. Clamped, hole filled
4. Collar formed, stem breaks flush
Traced from Cherry CA-1037 (Cherry SST), p.4, Installation. Not to scale.
Before you install
- Diameters offered: 1/8, 5/32, 3/16"
- Tool: Cherry pulling heads (CA-1037 tool selection chart)
- Standard shop tooling.
- Training: Not stated in the cited documents.
- Lead-time risk: Medium
Installed preload
Not published. CA-1037 and procurement spec PS-CMR-6000 checked; acceptance is entirely geometric.
Removal
No published removal procedure found; follow the manufacturer's instructions. Steps: speclok.com/tooling/cherry-sst#removal
Accept / reject after install
- Spindle flushness (above / below max): -4: .010"/.015"; -5: .010"/.020"; -6: .010"/.020" (PS-CMR-6000 Fig 1).
- Locking element flush with top of head within ±.005"; flash .010" max, and it must remain visibly inspectable after install.
- Head markings visible after install, depressed .010" max.
Check gauges
- Standard CherryMAX-type grip and hole gauges apply; no SST-specific gauge is published.
Sources: CA-1037 catalog · PS-CMR-6000. Acceptance limits belong to the controlling spec: verify against your program's process documentation before use on hardware.
Sources
Reference only: the controlling drawing, its process spec and the manufacturer's installation instructions govern. How to use these answers