Cross reference · Allfast · Blind rivet
AF1341 cross reference: Cherry CR2672, NAS1399C4A, Boeing ST3M678M
AF1341 is an Allfast blind rivet series on 6 government stock numbers. It is cross-referenced to Cherry CR2672, NAS1399C4A, Boeing ST3M678M. Each one is labeled with how strong the evidence is.
AF1341
- What it is
- Blind rivet, Allfast series, on 6 government stock numbers
- Equivalents
- ST3M678MBoeingCatalog onlyGovernment catalog: on 6 of 6 stock numbers. Confirm on the drawing.
- ST3MBoeingCatalog onlyGovernment catalog: on 5 of 6 stock numbers. Confirm on the drawing.
- NAS1399C4ANASCatalog onlyGovernment catalog: on 4 of 6 stock numbers. Confirm on the drawing.
- CR2672CherryCatalog onlyGovernment catalog: on 3 of 6 stock numbers. Confirm on the drawing.
- 3M1235CBoeingCatalog onlyGovernment catalog: on 3 of 6 stock numbers. Confirm on the drawing.
- Install tooling, by who made the part
- Allfast-made: not documented: no tool catalog on file names a nose for it.Ask a tooling specialist →
- Other makers: not documented. Check the maker on the CoC or packaging, then ask that maker or a tooling specialist.
The nose follows the maker, not the stock number: check the maker on the CoC or packaging.
Free to ask. A person at SpecLok replies by email. You only pay the supplier if you accept a quote.
Reference only: the drawing and its process spec govern. How to read this
- Issued by Allfast
- Item Blind rivet
- Stock numbers 6
- Cross-referenced series 9
- DLA paid $6.70 to $22.30 median
Series in the government catalog
Catalog-only listings need engineering approval before you substitute.
Manufacturers
- CR2672Cherry AerospaceCatalog only, needs approvalon 3 of 6 stock numbers, 3 sizes
2 more on one stock number each: CEM2672, CRM2672
- CEM2672Cherry AerospaceCatalog only, needs approvalon 1 of 6 stock numbers
- CRM2672Cherry AerospaceCatalog only, needs approvalon 1 of 6 stock numbers
Standards
- NAS1399C4ANASCatalog only, needs approvalon 4 of 6 stock numbers, 4 sizes
1 more on one stock number each: NAS1399C4AB
- NAS1399C4ABNASCatalog only, needs approvalon 1 of 6 stock numbers
Airframer and OEM drawings
- ST3M678MBoeingCatalog only, needs approvalon 6 of 6 stock numbers, 6 sizes
- ST3MBoeingCatalog only, needs approvalon 5 of 6 stock numbers, 5 sizes
- 3M1235CBoeingCatalog only, needs approvalon 3 of 6 stock numbers, 3 sizes
1 more on one stock number each: HS5435
- HS5435BoeingCatalog only, needs approvalon 1 of 6 stock numbers
Plus 3 reference numbers whose issuer SpecLok does not identify (distributors and catalog agencies are not named).
Get quotes for AF1341
Cited equivalents go on the request as acceptable alternates. Catalog-only listings do not.
Install tooling, by who made the part
- Allfast-made: not documented: no tool catalog on file names a nose for it.Ask a tooling specialist →
- Other makers: not documented. Check the maker on the CoC or packaging, then ask that maker or a tooling specialist.
The nose and tool follow who made the part, not the stock number: an equivalent fastener does not make another maker's noses interchangeable. Check the maker on the CoC or packaging, then use part number to tool.
What the government paid
DLA awards on 4 of 6 stock numbers, 43 awards from 2023-03-06 to 2026-05-15.
12 months to 2026-09-15: median per stock number $6.70 to $22.30 each (3 stock numbers).
1 unusual award (more than 3x off the median) on 1 stock number left out, check.
DLA production lead time: 120 to 149 days.
Per size in the table below.
DLA prices at DLA quantities, not a quote.Source
DLA award prices at DLA quantities and terms, not a commercial quote. Each award may bundle packaging, delivery and inspection terms that a commercial buy does not. Vendors are shown by CAGE code only.
The 12-month window is 2025-09-16 to 2026-09-15, ending at the latest award date in the loaded files. Medians are per stock number and unit of issue. An award more than 3 times above or below the median is marked unusual and left out; lines of one purchase order at the same date, price and CAGE count as one award. Where a stock number has no usable award in the window, the table shows the 12 months before its latest usable award, labeled older. A production lead time more than 3 times the page median, or at the file's 999-day maximum, is named as the longest instead of stretching the range.
Source: DLA FOIA Electronic Reading Room ↗, public FOIA releases. Files: 2023ContHist.zip/2023ContractHistory.txt, 2024ContHist.zip/2024ContractHistory.txt, contracthist2025.zip/contracthist2025.txt, 2026-09-16-1038_contracthist.zip/2026-09-16-1038_contracthist.txt.
Sizes by maker
| NSN | AF1341 | CR2672 | NAS1399C4A | ST3M678M | DLA median, 12 mo |
|---|---|---|---|---|---|
| 5320-01-132-5336 | AF1341-4-8 | NAS1399C4A8 | ST3M678M4-8 | $6.70 check | |
| 5320-01-210-3945 | AF1341-4-9 | NAS1399C4A9 | ST3M678M4-9 | ||
| 5320-01-131-9902 | AF1341-4-10 | NAS1399C4A10 | ST3M678M-4-10 | ||
| 5320-01-208-3881 | AF1341-4-11 | CR2672-4-11 | ST3M678M-4-11 | $10.88 | |
| 5320-01-242-7477 | AF1341-4-12 | CR2672-4-12 | NAS1399C4A12 | ST3M678M4-12 | $22.30 |
| 5320-01-217-2226 | AF1341-4-14 | CR2672-4-14 | ST3M678M4-14 | $19.82 older, 2024-11 |
Each row is one National Stock Number and the part numbers DLA FLIS lists on it, as written there. A blank means FLIS lists no part in that series on the stock number, not that the size does not exist.
Sources and how to read this page.Details
Reference numbers the Federal Logistics Information System records against the same National Stock Number. A supply-catalog cross-reference, not an engineering-approved interchangeability: confirm against the controlling drawing or spec before substituting. Only equivalents marked cited have a manufacturer or government document, linked with each.
Source: DLA Federal Logistics Information System, via DLA PUB LOG ↗ (FLIS Data Electronic Reading Room ↗), data as of 2025-03-18 (March 2025 snapshot). Federal supply class 5320 Rivets. Issuer names are SpecLok's reading of the filing CAGE code; distributors are not named. Compiled 2026-10-03.
Reference only: the controlling drawing, its process spec and the manufacturer's installation instructions govern. How to use these answers
Next step
Free to ask. A person at SpecLok replies by email. You only pay the supplier if you accept a quote.